St Barnabas Rest Home-Commercial Kitchen
Completion Date: Recently Client Name: St Barnabas Resthome Project Category: Joinery, Carpentry, Project management, Management of sub-contractors, Pre-planning prior to construction and planning, Logistics, Liaising with the client
The objective of this architecturally designed commercial
kitchen was complete functionality and included a large amount of
new structure, a walk in cool room and freezer, a walk in pantry, 7
kitchen sinks and basin units, both integrated and mobile bain
maries, and an easily replaceable vinyl floor.
This kitchen produces up to 300 meals a day- with 170 meals a
day being produced for meals on wheels, as well as meals for the 96
residents that live there which meant that we had a specific time
line and completion date for this project to be finished and
completely operational by and also had to work around the people
living in the rest home. This was a job that was tendered
competitively for by our team, and the end result was a very happy
client with the project being completed within the allocated time
frame and meeting all their requirements.
|
|
|