Kaikorai Valley Gymnasium
Completion Date: Mid 2008 Client Name: Kaikorai Valley School Project Category: Light Commercial Work
The major objectives of this light commercial design and build
project were simplicity, functionality and for minimal maintenance
work to be required, as well as integration of the new gym facility
with the existing hall and student and office areas. As the project
managers and contractors for this build, our team was given a
budget and scope of the project, and were told that ventilation and
light were crucial aspects.
This gym is fully insulated and heated by an innovative and
efficient oil-powered heating system, and features a ceiling
panelled with noise control panels. The end result was a
well-insulated, efficient, functional, and sound proof gymnasium,
with a full-sized court with room for viewing stands on the sides
of the court and at each end, delivered to the client on time and
on budget, and is a prime example of excellent communication
between the client and our team and an innovative "green"
building.
|
|
|